Terms of References (ToR) for a Consultancy to Conduct a Feasibility Study for the proposed project: A Voice for Inclusion – Equal Education and a Strong Civil Society for Children with Disabilities in Ethiopia, The Gambia and Zambia.
Assignment period: December 2026 – January 2027
Location:Ethiopia, The Gambia and Zambia
Commissioned by:ChildFund
Main Partners: ChildFund Deutschland, ChildFund Ethiopia, ChildFund The Gambia, ChildFund Zambia, Tesfa Birhan, Saama Kairo Federation, Chibombo/Mumbwa Child Development Agency, Kafue Child Development Agency
Donor: Project to be submitted to BMZ
Background and Context
Context of the assignment
Despite the ratification of the UN Convention on the Rights of Persons with Disabilities (UNCRPD) by Ethiopia (in 2010), The Gambia (in 2015) and Zambia (in 2010), many children with disabilities continue to face significant barriers to accessing and successfully completing primary education. Children with severe or multiple disabilities, intellectual or learning disabilities, sensory impairments, and disabilities that remain unidentified are often among the most excluded. Exclusion is further compounded by factors such as gender, age, poverty and geographical remoteness. In addition, the absence of systematic processes for identifying children with disabilities frequently limits their access to appropriate support services, accommodations and referral mechanisms.
Preliminary problem analyses conducted in all three countries suggest a number of common barriers and root causes. At family and community level, these include poverty and disability-related costs, transport and distance barriers, limited awareness of available support services, stigma and discrimination, weak parent support structures, safety concerns, and low expectations regarding the educational potential of children with disabilities. At school level, challenges include inadequate teacher preparation for inclusive education, insufficient follow-up coaching and mentoring, limited availability of assistive devices and adapted learning materials, inaccessible infrastructure, overcrowded classrooms, and constrained institutional and financial resources. Across all three countries, gaps are also evident between national policy commitments and their implementation at district, community and school levels. Common issues include weak coordination between sectors and administrative levels, insufficient funding, limited use of disability-disaggregated data, weak referral systems, and limited opportunities for meaningful participation of children with disabilities and their caregivers in planning and decision-making processes.
In Zambia, UNCRPD commitments are domesticated through the Persons with Disabilities Act No. 6 of 2012, which provides for the right to inclusive education and established the Zambia Agency for Persons with Disabilities (ZAPD), alongside the Education Act of 2011 and the Children’s Code Act of 2022. The free education policy introduced in 2022 removed school fees, yet children with disabilities in rural and peri-urban districts such as Kafue, Mumbwa and Chibombo continue to face barriers that fee removal alone does not address, including distance to school, limited district-level assessment and specialised services, few teachers trained in inclusive or special education, and stigma.
In The Gambia, commitments under the UNCRPD are supported by the Disability Act (2021), the Children’s Act, and the Ministry of Basic and Secondary Education’s Inclusive Education Policy Framework. Despite these policy commitments, children with disabilities continue to face significant barriers to accessing quality education, including late identification of disabilities, limited availability of specialised assessment and support services, inadequate assistive and learning resources, social stigma, and insufficient capacity within mainstream schools to respond to diverse learning needs. These challenges are often more pronounced in rural and underserved communities.
In Ethiopia, commitments to inclusive education are operationalised through the Constitution (Article 41), the education policy framework, and the current Special Needs/Inclusive Education Strategy (2022/23-2029/30), which aims to ensure equitable access to quality education for children, youth and adults with special educational needs and disabilities. Despite this strong policy commitment, significant barriers continue to hinder implementation at federal, regional, woreda and school levels, including weak disability data systems, limited early identification and referral mechanisms, shortages of trained inclusive education professionals, inadequate assistive devices and adapted learning materials, inaccessible infrastructure, and persistent stigma. These challenges are often compounded by poverty, displacement, geographical isolation and gender-related disadvantages, particularly in rural, pastoralist, conflict-affected and underserved communities.
While the analyses point to significant similarities in the patterns of exclusion across Ethiopia, The Gambia and Zambia, they are also highlighting important contextual differences. This creates opportunities for structured cross-country learning, knowledge exchange and the adaptation of effective approaches across different contexts. The planned project aims to address these challenges with an integrated micro-meso-macro approach: communities and families are sensitized and empowered; schools are developed into inclusive learning environments, mainly through training and development plans; and civil society organisations are strengthened to carry out advocacy work for inclusive education. The multi-country nature of the program offers an opportunity to generate evidence, promote cross-learning and identify scalable approaches that can strengthen inclusive education systems beyond the targeted locations.
Inclusive education is both a rights-based obligation and a strategic investment in human capital, social inclusion and sustainable development. Ensuring that children with disabilities can access and succeed in education contributes to national development priorities, advances SDG 4 commitments, and supports broader efforts to ensure that no child is left behind.
Brief about ChildFund International as the organization commissioning the study
ChildFund International is a global child- and youth-focused development and humanitarian organization dedicated to advancing the well-being, resilience, and rights of children and young people, particularly those facing vulnerability and exclusion. Working through local partners, communities, governments, and civil society, ChildFund promotes locally led and owned development approaches that strengthen systems, build community capacity, and create sustainable impact for children and their families. Its programmes focus on education, child protection, health, livelihoods, and youth empowerment, with an emphasis on achieving lasting outcomes that enable children and young people to learn, thrive, and contribute meaningfully to their communities.
This assignment is commissioned by ChildFund International to inform the design and implementation of a multi-country inclusive education programme in Ethiopia, The Gambia, and Zambia. The International Office (IO) will provide overall strategic direction, technical leadership, and quality assurance; the Africa Regional Office (RO) will provide regional coordination, technical oversight, and facilitate cross-country learning; while the respective Country Offices (COs) will lead country-level coordination, stakeholder engagement, and contextual guidance to ensure the study reflects national priorities and local realities.
Brief about the proposed project
The proposed multi-country programme seeks to improve equitable access to, participation in, and quality of inclusive primary education for children with disabilities in Ethiopia, The Gambia, and Zambia. The programme is founded on the recognition that educational exclusion results from interconnected barriers at household, community, school, and systems levels, requiring a coordinated and multi-level response.
Through a locally grounded and systems-strengthening approach, the programme aims to ensure that children with disabilities, including those who are currently out of school, are identified, enrolled, actively engaged in learning, and able to make measurable progress in foundational literacy and numeracy. Particular attention will be given to children facing multiple and intersecting forms of exclusion, including girls with disabilities, children with high support needs, children living in poverty, and those in remote or underserved areas.
To achieve these outcomes, the programme will pursue an integrated micro-meso-macro approach that combines community engagement, inclusive school development, institutional capacity strengthening, and policy engagement through four complementary result areas.
Proposed Output 1: Family and Community Environment
Children with disabilities will be identified through community-based identification and referral mechanisms. Parents/caregivers will be supported to promote school enrolment and effectively address the learning needs of children with disabilities, including through effective referral systems and linkages to service providers, in line with the programme's systems-strengthening and sustainability objectives. Parents/caregiver self-help groups will be established and/or strengthened to address barriers to education and support sustained participation, retention, and educational success for children with disabilities.
Proposed Output 2: Inclusive Schools and Learning Environments
Target schools will be supported to strengthen inclusive teaching and learning practices through teacher training, coaching and mentoring and the development of learning materials and methods aligned with the needs of children with disabilities. Existing school structures will be trained and supported to introduce inclusive school development plans, thereby embedding inclusive practices within school systems and leadership structures to support long-term implementation, ownership, and scalability beyond the life of the programme. Model schools will be equipped with accessible infrastructure, demonstrating how accessible learning environments contribute to sustainable institutional change and improved learning outcomes; while other project schools will be supported to identify, prioritise and cost accessibility improvements, with project funding complementing local resources and budgets where available.
Proposed Output 3: Civil Society Capacity and Advocacy
Through cross-national learning and collaboration, civil society organisations will strengthen their capacity to generate and use evidence on effective and cost-efficient inclusive education practices, engage in evidence-based advocacy, and promote the active participation of persons with disabilities and their representatives in education policy processes. A joint cross-national platform will facilitate the long-term exchange of evidence, implementation experiences, costing data and advocacy tools to support the institutionalisation and financing of inclusive education practices.
Proposed Output 4: Policy Implementation and Local Adoption
Under Output 4, civil society organisations and OPDs will be supported to translate evidence and lessons learned from project implementation and cross-country exchange into advocacy messages, policy recommendations and budget proposals for inclusive education. Through engagement with policy-makers, planning bodies and coordination mechanisms, opportunities will be created to foster government ownership and to promote the uptake of effective and cost-efficient inclusive education practices within planning, budgeting and resource allocation processes. This will support the use of evidence to inform scalable and sustainable system-level improvements, strengthen the institutionalisation of inclusive education practices within government systems, and contribute to the sustained delivery of inclusive education services beyond the project period.
Through these interconnected interventions, the programme aims to contribute to a situation in which children with disabilities in the target communities are able to enrol in school, participate effectively in classroom learning and achieve measurable improvements in foundational literacy and numeracy. In the longer term, the programme seeks to strengthen inclusive education systems and support the sustainable implementation of inclusive education policies and practices across the three participating countries.
Purpose and Scope of the Feasibility Study
Study Type
A feasibility study provides an evidence-based foundation for project design and investment decisions by assessing implementation readiness, opportunities, risks, and key assumptions and offering guidance and possible improvements. The findings will inform programme optimisation and effectiveness, identify pathways for sustainable and scalable impact, and help ensure that resources are directed towards interventions with the greatest potential to improve inclusive education outcomes.
Purpose of the Study
The purpose of the feasibility study is particularly to assess the feasibility of the proposed project and systematically examine the extent to which the project approach can plausibly achieve the planned changes under the existing conditions. Specifically, the study focuses on these specific topics:
1. Evidence Base and Context Analysis
Identify and review relevant international, regional and national evidence related to disability-inclusive primary education, including successful approaches, lessons learned, policy frameworks, implementation models and emerging good practices.
Establish baseline information on the current situation of children with disabilities, schools, communities and relevant stakeholders in the target areas in order to inform project design and future monitoring. All proposed baseline data should be disaggregated by region/district, sex, age, grade/educational level and type of disability.
Map existing systems, services, structures and coordination mechanisms relevant to disability-inclusive education and determine where the project should strengthen existing systems, fill critical gaps or avoid duplication of existing initiatives.
2. Relevance and Strategic Fit
Evaluate the relevance of the proposed project activities, objectives and strategies in relation to the needs of target groups, existing systems and the broader context.
Assess the strategic rationale and expected added value of the proposed multi-country approach compared to separate country-level interventions. The study should analyse common challenges, complementary strengths, opportunities for cross-country learning, joint advocacy, knowledge exchange, mutual capacity development and the transfer of effective inclusive education practices, as well as factors that justify the selection of Ethiopia, The Gambia and Zambia as participating countries.
Recommend practical and financially realistic strategies for ensuring that the project benefits children with different types of disabilities, including those who are often most excluded, such as children with intellectual disabilities, communication difficulties, multiple disabilities and higher support needs.
3. Validation of the Proposed Intervention
Validate the project's Theory of Change, he proposed indicators, baseline and target values and recommend revisions where necessary to ensure realistic and measurable results; also assess the plausibility of the proposed causal pathways and expected outcomes.
Assess how the proposed intervention can most effectively contribute to meaningful participation and measurable improvements in foundational literacy and numeracy outcomes for children with disabilities. The study should identify critical success factors, potential barriers and additional measures required to ensure that increased enrolment and attendance translate into improved learning outcomes.
Assess the availability and capacity of existing systems for feasible, ethically appropriate, disability-responsive assessment, identification, referral and learning support/educational-support pathways, referral completion, feedback loops, case follow-up and service-capacity constraints. This should include an analysis of whether learning assessments can be adapted to different impairments, the uptake of Universal Design for Learning in the target schools so far, the availability of specialised teaching and learning materials and assistive devices, and the capacity of government services, OPDs and other actors to assess children's needs and facilitate access to appropriate support.
Test key assumptions underlying the project design, including assumptions related to identification and referral systems, teacher retention, stakeholder engagement, service availability, maintenance of infrastructure, the added value of cross-country learning and the sustainability of project-supported approaches.
Assess the feasibility of local adoption and financing of tested inclusive education practices by schools, local authorities and government structures, including opportunities for incorporation into existing planning, budgeting, supervision and school improvement systems
Assess the integration of cross-cutting issues, including gender equality, child safeguarding, conflict sensitivity and environmental sustainability.
4. Capacity and Feasibility Assessment
Assess the operational feasibility of the proposed intervention, including availability of resources, institutional arrangements and stakeholder commitment at community, district and national levels.
Assess the organisational and technical capacities of the proposed implementing partners and evaluate whether the proposed intervention is realistic and proportionate to their current capacities. The study should identify existing strengths, capacity gaps and the capacity development measures required to enable partners to successfully implement, monitor and sustain the proposed interventions.
Identify external factors, contextual influences and implementation risks that may affect the achievement and sustainability of project results.
Assess the likelihood that project-supported approaches, services and practices can be sustained, institutionalised and financed by local actors after project completion.
5. Optimisation and Recommendations
Assess the extent to which the proposed project design is realistic within the available budget and identify opportunities for simplification, prioritisation and cost-efficiency.
Review and, where necessary, refine the proposed intervention strategy, impact matrix, outputs and indicators (including baseline and target values) based on study findings, including the development of recommendations for indicators and targets that have not yet been defined.
Provide evidence-based recommendations for improving project design, implementation arrangements, targeting, monitoring, partnership development, capacity strengthening, sustainability and scalability
Assessment Criteria
The study should present the context of the planned project at all relevant levels (micro, meso, macro) and also include key data relevant to the project regarding the initial situation. Building on this, an analysis should be carried out to determine the extent to which the chosen approach can contribute to resolving the problem for the target groups and other stakeholders. Recommendations for adjustments to the specific project concept – including the draft impact matrix and suggested measures – should be formulated in as concrete a manner as possible. In doing so, consideration must be given to the actors and stakeholders to be involved, proposals for areas to be monitored in terms of outcome and impact measurement, and the opportunities and risks involved.
Furthermore, the proposed project should be critically assessed in the light of the OECD DAC criteria of relevance, coherence, effectiveness, efficiency, impact and sustainability:
Relevance: Does the planned project approach address a key development issue or a critical development bottleneck in the partner countries? Are the focus, priorities and objectives (approach) of the planned project aligned with the target groups and clearly defined? To what extent do the intervention objectives and design adequately take into account the specific needs of the target groups and structural barriers in the project countries, the partner organisations, and the political programmes? Are the norms and standards of the approach compatible with those of the target groups? Is the project designed with conflict sensitivity in mind (the ‘Do No Harm’ principle)?
Coherence: To what extent are the planned activities consistent with human rights principles (inclusion, participation), conventions and relevant standards/guidelines? To what extent are there synergies and links between the planned project and other interventions by the same partners and other actors? What overlaps or common ground exist between the target groups of this project and those of other actors’ projects in the same context? To what extent does the intervention add value and avoid duplication of effort?
Effectiveness: Are the causal relationships (including assumptions) plausible? What negative effects might arise? Is the chosen methodological approach appropriate to the context and sufficient to achieve the project’s objective? At what level (multi-level approach) should additional measures be planned to increase effectiveness? How will changes be measured (baseline and endline tools)? Are the indicators in the draft impact matrix suited for this?
Efficiency: To what extent can the planned measures be implemented within the planned timeframe and allocated funds? Which staffing investments, operating costs and staffing levels are recommended proportionate to the intended objectives?
Impact: How does the project objective (outcome) contribute specifically to the overarching objective (impact)? To what extent does the planned project contribute to structural development, serve as a model and have a broad, cross-national impact beyond progress within each country and beyond the project period? At what levels are standards or structures being changed?
Sustainability: How can the sustainability of the results and impacts be ensured and strengthened (structurally, economically, socially, environmentally)? What long-term capacities are being built up within the target group to enable them to continue the implemented measures independently? What positive changes (role behaviour, mechanisms, networks and others) benefit civil society in the long term? What personnel risks for those implementing the measures, as well as institutional and contextual risks, affect sustainability, and how can these be minimised?
On the basis of the key findings relating to the purpose of the study and the assessment of the project concept against the DAC criteria, the study should make clear recommendations which specific proposals and improvements should be incorporated into the project concept.
Key assessment questions
Building on the specific topics described above and the OECD-DAC criteria described, the study should address the following key questions:
1. Purpose and use of the feasibility study
How conducive is the context (sector, components, project regions) with regard to the projects’ objective?
How feasible is achieving the proposed project outcome and the underlying Theory of Change as well as the proposed indicators? And how coherent is the proposed intervention across sectors, outputs and countries? Which critical assumptions underpin the project's Theory of Change, and to what extent are these assumptions supported by available evidence and stakeholder perspectives?
Which factors are most likely to influence whether increased enrolment and attendance translate into improved learning outcomes for children with disabilities?
How can the study findings contribute to adaptive management, organisational learning and project refinement across all three countries?
2. Methodology
What participatory methods, tools, and resources will be used for data collection and analysis (incl. recommendation of baseline and endline tools)?
Which stakeholders will be involved? What are their backgrounds and interests? How can meaningful participation of children with disabilities, caregivers, schools, civil society organisations, OPDs and government stakeholders be ensured?
3. Initial situation and problem analysis, on macro- meso- and micro-levels
What current problems of children with disabilities have been identified at micro, meso and macro levels, relevant to the proposed project? Which of the causes of these problems will be prioritised and addressed in the project?
What existing root causes, local potential, structures (institutions, networks, umbrella organizations etc.) and social mechanisms can be built on? What gaps have been identified in the system? Which existing identification, referral, assessment and support systems for children with disabilities are functioning effectively and where do significant gaps remain?
What specialised teaching and learning materials, assistive devices and support services are currently available, and where are the most significant gaps? To what extent can existing education assessment systems be adapted to different impairment groups, and what constraints currently limit equitable assessment of learning outcomes?
What currently prevents children with disabilities from progressing from enrolment to meaningful participation and improvements in foundational literacy and numeracy?
Are there any approaches or results from previous development measures? If yes, how can they be extended?
Which existing government, community and OPD structures should be strengthened rather than duplicated by the project?
What other circumstances, for example conflict dynamics, must be taken into account in the context of the selected countries?
4. Local project partners in the partner countries
Which organisations have been selected as local project partners, and why? How will the local project partners’ ownership be improved?
Are the partners’ resources and strengths, both individually and at an organisational level, well understood? To what extent does the project planning align with the current capacities of the local partners Tesfa Birhan, Saama Kairo Federation, Chibombo/Mumbwa Child Development Agency, Kafue Child Development Agency? Is selective support from staff of the ChildFund International Country Offices necessary and justified and which project functions can realistically be led by the local partners themselves?
What coordination structure between the local partners is recommended?
What relevant technical, methodological and advocacy competencies will be further developed within the local partners through the project to strengthen their long-term capacity for implementation, coordination and advocacy?
5. Beneficiaries and other stakeholders (on a micro-, meso- and macro-level)
How (with which criteria) will the direct beneficiaries be selected, and by whom?
Which groups of children with disabilities are most likely to benefit from the proposed intervention as currently designed, and which groups may require adapted approaches or additional support measures?
How is the diversity within the target groups, including disability type, age, gender, socio-economic situation and location, and to what extent must the project take this into account? How can different disability groups can be meaningfully included and the proposed interventions be adapted to address the specific needs of different impairment groups and support requirements?
What potential do the beneficiaries have for self-help?
Do the beneficiaries and other stakeholders have a common understanding of the problems, prioritising process and objectives of the project? Do the interests of other stakeholders align? Do any conflicts of interest exist?
How strong is the various stakeholders’ support for the project, for example, in terms of their own contribution? In what ways might they influence the project?
6. Multi-Country Dimension
What is the added value of implementing the proposed project with a multi-country approach compared to stand-alone country projects? What common objective – beyond progress within each country – justifies the multi-country approach? Does this justify the additional complexity and coordination effort of a three-country programme?
What is the rationale for the selection of Ethiopia, The Gambia and Zambia? What are the relationships between the three project countries and what are shared and country-specific barriers, opportunities for cross-country learning and potential for joint advocacy and knowledge exchange? Could a project with only two countries achieve similar results more effectively?
What existing (cross-national) structures does the project build upon, and what will remain after the project ends? How can sustainability be ensured across all three countries, and into which umbrella organization, active in all three countries, can results of the project be incorporated; and what lasting mechanisms for cooperation, joint learning and advocacy could be established or strengthened?
7. Strategic and Financial Feasibility
How realistic is the proposed intervention design under the available budget envelope?
Are any adjustments required to the indicators, baseline and target values to ensure they are achievable, measurable and aligned with the proposed intervention design and budget?
What are potential simplifications and prioritization options, and which project components are essential to preserve the intended outcomes and Theory of Change?
Which elements of the proposed intervention are most likely to be institutionalised and financed by local actors after project completion, and what mechanisms or arrangements are required to sustain both project results and cross-country cooperation beyond external funding?
Study Methodology
The study will comprise both desk-based research and fieldwork. It will involve a combination of primary data collection and secondary data review.
Selected secondary data sources will be made available to the contractor. The following documents will be provided:
Initial concept note for the planned project
Draft impact matrix
Draft theory of change
Initial problem analysis conducted by the partners
Partner documents relevant to the planned project
Selected national strategy documents, background papers, references
For the collection of primary data, the contractor is encouraged to propose appropriate methodological approaches (quantitative, qualitative, or mixed methods). The study methodology should, where appropriate and ethically feasible, include the direct participation of the project’s primary target group – children with disabilities. The study should ensure that the voices and perspectives of children with disabilities and their families are reflected in the findings, particularly with regard to their participation in project activities and perceived changes in their living conditions.
The contractor is expected to propose appropriate, age-sensitive, and ethically sound data collection methods for engaging with children and youths, in line with relevant safeguarding and ethical standards.
In addition, the study should include the following data collection methodologies:
Desk and literature review
Stakeholder consultations
Field visits
Key Informant Interviews with partner staff, community leaders, and other relevant stakeholders
Focus Group Discussions with intended target groups
Household or individual surveys (quantitative data collection)
Workshop/validation meeting to review preliminary findings with partners and stakeholders
Ethical Consideration
It is essential to ensure that the risks of potential harm to participants arising from the data collection process are minimized and clearly outweighed by the potential benefits of the study’s outcomes. The contractor must address critical ethical issues in the design and implementation of the study, ensuring that the rights, safety, and confidentiality of all information providers are fully protected. Key considerations include, but are not limited to:
Compliance with legal and regulatory requirements, including permissions for data collection, storage, export, and, where applicable, interviewing or collecting information about children and youth.
For Zambia: Research ethics clearance from the Research Ethics Committee, and authorisation from the National Health Research Authority (NHRA) where health-related data (e.g., functional screening) are collected; written authority from the Ministry of Education and the respective DEBS offices to conduct research in schools; and compliance with the Data Protection Act No. 3 of 2021 and the Children’s Code Act of 2022.
For The Gambia: IRB approval from the university of the Gambia (UTG), Compliance with national child protection and safeguarding regulations, relevant data protection requirements, approvals from MoBSE and Regional Education Directorates, and adherence to ChildFund safeguarding standards when engaging children with disabilities and their caregivers.
For Ethiopa: Determine whether ethics review is required, secure federal/regional/woreda and school permissions, and comply with Personal Data Protection Proclamation No. 1321/2024, including special protections for children, disability/health data, storage and cross-border transfer
Measures to ensure the secure storage and management of collected data.
Protocols to maintain anonymity and confidentiality of participants.
Ensuring that participation is voluntary and based on informed consent.
Safeguarding the rights and welfare of participants and the communities involved.
The contractor should take all reasonable steps to ensure that the study is designed and conducted to:
Respect and protect the rights, dignity, and welfare of all participants.
Produce technically accurate, reliable, and valid findings.
Conduct the study in a transparent, impartial, and accountable manner.
Contribute to organizational learning and accountability.
Ethical considerations must be an integral part of the study process at all stages to maintain the highest standards of professional conduct.
Time Schedule and Deliverables
The study will be carried out according to the following timeline and corresponding tasks:
Timeline Tasks
1st week of December 2026- Briefing and preparation
2nd week of December- Desk review and preparation of the inception report
2nd week of December- Review of inception report by the project team
3rd week of December - Finalization of the inception report
3rd and 4th week of December- Development of data collection tools
1st week of January- Primary data collection and Field visit(s)
2nd week of January-Data analysis
3rd week of January-Drafting of the preliminary study report and Presentation of preliminary findings / validation workshop
4th week of January-Review of draft preliminary study report by the project team
End of January 2027-Finalization of the study report and final submission
Each deliverable is expected to be submitted according to the agreed timeline, ensuring sufficient time for review and feedback from the project team. Specific dates for each activity and deliverable will be defined in consultation with the contractor and the project team and documented in the inception report.
Deliverables
Inception Report:
The contractor should prepare an inception report before commencing the full data collection exercise. The report should detail the contractor’s understanding of the planned project and the study, explaining how each question will be addressed through proposed methods, data sources, and data collection procedures. It should also include a proposed schedule of tasks, activities, and deliverables.
Preliminary Study Report:
The contractor should provide a concise report presenting all preliminary findings, conclusions, and recommendations. The methodology used should also be described.
PowerPoint Presentation of Key Findings:
The main findings from the preliminary report should be presented by the contractor during the validation workshop.
Final Study Report:
The final report should be aligned with the Sample outline for evaluation reports from donor (which will be provided to the contractor) and include, among others:
Executive summary
Description of the planned project
Study goals and objectives
Study methodology and data collection tools used
Presentation of main findings and conclusions
Country-specific chapters or annexes for Ethiopia, The Gambia and Zambia, each containing a country context analysis, partner capacity assessment and country-level recommendations
Overall recommendations; executive decision matrix showing issue, evidence, recommendation, priority, cost implication, responsible actor and proposed revision to the concept/logframe
Annexes, including data collection tools, list of interviewees, sources, and other relevant documentation
All documents, except annexes to the feasibility study report, must be submitted in English. The report should have a maximum of 30 pages (except annexes).
Expertise Profile of the Study Team
The study will be conducted by a lead consultant with proven experience in conducting feasibility studies for development projects and sectorial expertise in inclusive education, supported by qualified local consultants in the three countries.
A statement on the independence of the study team from the organizations involved is mandatory.
The consultant(s) we are seeking should meet the following criteria:
Professional experience: Minimum of 5 years of experience in evaluating development projects and assessing the feasibility of planned development projects. Evidence of this experience should be provided.
Technical expertise: Demonstrated knowledge of relevant study methods and tools as well as education and inclusion programs in international development coordination.
Stakeholder engagement: Experience with participatory approaches, stakeholder consultation, and transparent knowledge management.
Methodological, analytical and communication skills: Strong analytical, report writing, and presentation skills.
Language proficiency: Fluent in English (mandatory), fluency in relevant local languages in Ethiopia, The Gambia and Zambia required for local consultants
Formal: Permit/Ability to work in Ethiopia, The Gambia and Zambia
Management and Coordination of the Study
The Regional Office (RO) will provide overall leadership and coordination of the study, including the procurement and management of the lead consultant responsible for implementing the assignment across the three countries. The lead consultant will oversee the study's implementation, engage qualified local consultants to conduct country-level data collection and analysis, and prepare individual country reports. Building on these findings, the lead consultant will synthesize the country reports into a single regional study report for submission to the Regional Office. The RO will review and finalize the report and formally submit the final study report to ChildFund Deutschland. Throughout the process, close collaboration and consultation will be maintained with ChildFund Deutschland to ensure alignment with the study objectives, methodology, quality standards, and expected deliverables.
Evaluation Criteria
Proposals will be assessed by an evaluation panel. The technical proposal accounts for 70% (70 points) and the financial proposal for 30% (30 points) of the total score of 100 points. Financial proposals will only be opened for bidders whose technical proposals achieve a minimum of 49 out of 70 points (70% of the technical score).
8.1. Technical evaluation (70 points)
Criterion
Description
1. Understanding of the assignment and methodological approach- 15 Marks
Understanding of the ToR and of the inclusive education context in Ethiopia, The Gambia and Zambia; rigour and feasibility of the mixed-methods design, sampling, tools and analysis plan; coverage of the OECD DAC criteria and key assessment questions; approach to validating the Theory of Change, indicators and baseline/target values and to producing prioritised recommendations.
2. Participation, ethics and safeguarding- 10 Marks
Approach to the meaningful and ethical participation of children with disabilities, caregivers and OPDs; child safeguarding, informed consent, data protection and country-specific ethical clearance.
3.Team composition- 15 Marks
The lead/principal consultant MUST have associates within the participating countries (Ethiopia, Zambia and The Gambia) or structures to bring them onboard within a very short turnaround time.
4. Qualifications and experience of the study team- 10 Marks
Lead consultant with at least 5 years of experience in evaluating and assessing the feasibility of development projects; expertise in inclusive education and disability inclusion; equally qualified local consultants with relevant languages and permits in all three countries; complementary skills and gender balance.
5. Past performance and references- 10 Marks
Two comparable feasibility studies or evaluations (preferably for BMZ or similar donors, in Africa, in education or disability inclusion) with report samples, and at least two client references.
6. Work plan, risk management and independence- 10 Marks
Realistic work plan aligned with Section 5 and cross-country coordination; risk mitigation and quality assurance for country and synthesis reports; statement of independence and conflict-of-interest disclosure.
Total technical score- 70 Marks
7. Financial evaluation (30 points)
The financial proposal must present a transparent budget in a single currency, with professional fees (daily rates and number of days) for the lead and local consultants, travel and logistics for field visits in the three countries, data collection costs, and applicable taxes. The budget must be realistic and consistent with the proposed methodology and work plan
Schedule of Payment
Payment will be made in three instalments against approved deliverables, as set out below. Percentages refer to the total contract value agreed in the contract.
Instalment 1- Inception report approved by ChildFund at End of 2nd week of December 2026- 30%
Instalment 2- Preliminary study report and validation workshop completed- End of 4th week of January 2027- 30%
Instalment 3- Final study report (including country chapters and executive decision matrix) approved by ChildFund -End of January 2027- 40%
Total- 100%
Required Documents
Consultant should submit the documents as mentioned below along with the Technical and Financial proposal.
Certificate of Incorporation / Business Registration Certificate
CR12 (where applicable)
Valid Tax Compliance Certificate
Updated Company Profile
Bank details
Key contact details (Contact Person, Postal Address, Telephone and Email address)
Annex 1: Country-specific guidance and questions for the study
Country- Zambia
Regarding Evidence Base and Context Analysis
baseline data should draw on Ministry of Education EMIS / Annual School Census data for the target schools
The mapping of existing systems, services, structures and coordination mechanisms should include, among others: the Ministry of Education (directorate responsible for special/inclusive education, Provincial Education Offices, DEBS offices and Zonal Resource Centres); ZAPD; the Ministry of Community Development and Social Services (social welfare, Social Cash Transfer); the Ministry of Health (early identification and rehabilitation services); the Zambia Institute of Special Education (ZAMISE); OPDs affiliated to the Zambia Federation of Disability Organisations (ZAFOD); the Zambia National Education Coalition (ZANEC); and NGOs active in inclusive education in the three districts.
Regarding the Validation of the Proposed Intervention
include specifically assessing the availability and functionality of district-level educational assessment services, the examination accommodations offered by the Examinations Council of Zambia (ECZ) for learners with special educational needs, and the availability of learning materials in the local languages of instruction, braille and Zambian Sign Language
test assumptions related to teacher transfers and redeployment of trained teachers, the functionality of district referral pathways, and the effects of climate shocks (drought, floods) on school attendance.
Cross-cutting issues: climate resilience (e.g., the 2023/24 El Niño drought and flood-prone areas of Kafue), school-related gender-based violence and child marriage risks for girls with disabilities, and child safeguarding in line with the Children’s Code Act 2022. In Zambia, conflict sensitivity concerns local political dynamics more than armed conflict.
Regarding the Capacity and Feasibility Assessment
the assessment of the sustainability should include the potential for integration into district education plans and budgets, the Constituency Development Fund and Ministry of Education CPD structures
Regarding the relevance
alignment with the Eighth National Development Plan (2022–2026) and its successor plan, the Persons with Disabilities Act No. 6 of 2012, the Education Act of 2011 and Ministry of Education inclusive education priorities
what can Zambia can contribute to and gain from cross-country learning?
Country - The Gambia
Regarding Evidence Base and Context Analysis
analysis should draw upon available EMIS data, National Disability Survey findings, Disability Unit records, and existing data from Organisations of Persons with Disabilities (OPDs) and Inclusive Education structures within MoBSE
The mapping of existing systems, services, structures and coordination mechanisms should include, among others, Ministry of Basic and Secondary Education, Regional Education Directorates, the Gambia Federation for the Disabled, Ministry of Health, Department of Social Welfare, National Human Rights Commission, Organisations of Persons with Disabilities, Madrassa authorities, itinerant teacher structures, School Management Committees and disability-focused civil society organisations.
Regarding the Validation of the Proposed Intervention
assess the functionality of existing referral pathways linking schools, health services and social welfare actors, the effectiveness of the itinerant teacher model, access to sign language support, early identification mechanisms, and the availability of assistive devices and adapted learning materials for children with disabilities.
test assumptions related to the sustainability of itinerant teacher support, functionality of referral networks, retention of trained teachers, community acceptance of inclusive education practices, and the availability of specialised disability support services outside major urban centres
Cross-cutting issues: gender-related barriers affecting girls with disabilities, safeguarding risks, accessibility of Madrassa education for children with disabilities, child protection concerns, and the inclusion of children living in hard-to-reach communities.
Regarding the Capacity and Feasibility Assessment
the assessment of the sustainability should examine opportunities for institutionalisation through MoBSE structures, integration into School Improvement Planning processes, Regional Education Directorates, community-based structures, and existing disability coordination mechanisms at national and regional levels
Regarding the relevance
alignment with the Disability Act 2021, the Inclusive Education Policy Framework, the National Development Plan, MoBSE priorities, and commitments relating to disability inclusion and equitable access to education
how can the Gambian experience in community-based disability inclusion, itinerant teacher approaches, engagement with Madrassas, and multisectoral disability coordination mechanisms contribute to cross-country learning and adoption of good practice across the programme countries
Country- Ethiopia
Regarding Evidence Base and Context Analysis
baseline data should draw on Ministry/Regional Education Bureau EMIS and school records, supplemented by primary data where gaps exist
The mapping of existing systems, services, structures and coordination mechanisms should include, among others, the Ethiopia Ministry of Education, relevant Regional Education Bureau(s), woreda education offices, schools and cluster/resource centres, Ministry/regional health structures and rehabilitation services, Special Needs Education units, Women and Social Affairs structures, teacher education institutions, Ethiopian Center for Disability and Development and relevant OPD federations/associations; UNICEF/UNESCO and NGOs active in inclusive education, local assistive-product and braille/sign-language actors
Regarding the Validation of the Proposed Intervention
asses at woreda level, the functionality and coverage of Inclusive Education Resource Centres, itinerant teachers and special-needs professionals; the deployment and capacity of Special Needs Education teachers; the availability and completion of referral pathways to rehabilitation and health services; sign-language and braille support, including learning materials in braille and other accessible formats; the accessibility of school infrastructure; and the extent to which Universal Design for Learning (UDL) principles and inclusive pedagogical approaches are applied in target schools.
Distinguish “disability diagnosis” from functional difficulty screening and educational support assessment. In Ethiopia, health, education and social-service access is uneven, so the project must not rely on medical certification as the sole route into support.
test assumptions related to safe and continuous access to target sites, school functionality, population movement, teacher deployment, inflation and procurement lead times, and climate-related disruption.
Cross-cutting issues: disability inclusion, gender and age, safeguarding/PSEA, conflict sensitivity, climate resilience, language and culture, displacement, data protection and environmental/social accessibility. Girls with disabilities may face heightened violence, exploitation, care burdens and menstrual-health barriers.
Regarding the Capacity and Feasibility Assessment
the assessment of the sustainability should examinea costed capacity-strengthening plan with responsible party, timing and sustainability pathway as well as the institutional capacity of Organizations of Persons with Disabilities (OPDs) and disability-focused civil society organizations to engage in advocacy, evidence generation, policy dialogue, community mobilization, and monitoring of inclusive education policies. The assessment should also identify opportunities for strengthening collaboration between government institutions, schools, and representative organizations of persons with disabilities.
Regarding the relevance
alignment with the Federal Ministry of Education’s Special Needs/Inclusive Education Strategy (2022/23–2029/30), national education-sector plans, implementation frameworks, regional education priorities, and commitments to inclusive, equitable and quality education in support of SDG 4
how can Ethiopia’s experience in implementing inclusive education through federal, regional, woreda and school-level structures contribute to cross-country learning and the adoption of good practice across the programme countries
How to apply
Application Procedures
Interested vendors should submit their technical proposal and financial quotation by end of day 29th November 2026 through to KenyaProcurement@childfund.org
Let RezSync apply to roles like this.
Set up your search once. RezSync matches you to open roles like this one (this one too, if it fits your CV and is still open) and sends a tailored application for each, with a full log and a pause switch you own.
More applications for less effort. Employers decide who they interview; RezSync does not guarantee a job.
Prefer to apply yourself? Apply on reliefweb.int